|
and equipped !
Facts and figure about JFA
Created in : 1993
Director : Frédéric Jaouen
Main technical means :
Total Area : 3 000 m2
Covered hanger : 520 m2
Metal working area : 350 m2
Cabinetry : 440 m2
Atmosphere controlled paint and varnish cabin (120 m2)
Direct hook up in the factory for yachts up to 500 t
2 travel lifts : 5 tonnes
Completely equipped design office with CAO/DAO (Autocad 3D)
Materials currently used in the construction and renovation of hulls: Wood, Aluminum, Steel, Composite.
DRY DOCK
Concarneau and its professionals undertook heavy investments in order to perpetuate naval construction and repair activities: today the port has its own dry dock. From now on this new tool will allow the shipyards of Concarneau to handle the repairs and haul-out of ships weighing more than 2,000 tons. The new means permitting JFA to reception mega-yachts for repairs.
INDUSTRIAL BUILDING
The third construction hall is completed. Its dimensions along with the direct access to the ship elevator express JFAs
determination to be a major player in the motor yacht market. This
building has been enlarge in 2004 in order to receive
yachts until 48m..
CREW BUILDING
Whether a new boat is being built, a complete refit
is being done or long wintering begins, JFA makes a dry warm building available
to the captain and project manager for storing materials,
as well as office and meeting room to accomplish their tasks.
|